This month marks the grand opening of the East Midtown Greenway, spanning from East 53rd Street to East 61st Street in Manhattan. This achievement was made possible through the outstanding efforts of union contractors and carpenters with the New York City District Council of Carpenters. The Greenway’s design showcases three integral components: a pedestrian bridge, an in-water structure, and a topside landscape with a bike path. The strategically positioned pedestrian bridge at 54th Street serves as a vital link, connecting both pedestrians and bicyclists and fostering a sense of community within the greenway. The meticulously crafted walkway, with breathtaking views of the city, is both beautiful and functional. It is poised to become a cherished addition to the midtown community.
#midtown #manhattan #construction #walkway
53rd to 61st Streets
Anchormen Construction, LLC
Atlas Concrete Corp.
Celtic Marine Services Corp.
J. D’annunzio & Sons, Inc.
Keller North America, Inc.
Keller Industrial, Inc.
Skanska USA Building, Inc.
Trevcon Construction
Weeks Marine Incorporated
Photo Credit: East Midtown Greenway, courtesy of Stantec